|

The details about the HO-scale layout will be coming shortly. Please check back in the near future.

(February 2001)
Layout Statistics
| Name of railroad: |
South Bay & Pacific |
| Size: |
Approximately 15'x80' |
| Bench Work: |
- Framed plywood
- Some spline construction on mainlines.
|
| Prototype theme: |
|
| Time Frame: |
|
| Layout style: |
Walk around peninsula. |
| Layout Routes: |
|
| Operational Control: |
- Digitrax DCC throttle controls.
- Bruce Chubb's CMRI
|
| Roadbed: |
|
| Track: |
- Code 70 where visible to public
- Code 83 in hidden areas
|
| Length of Track Runs: |
- Double Track Mainline =
- Point-to-Point =
|
| Turnouts: |
|
| Minimum Radius: |
|
| Maximum grade: |
|
| Scenery: |
Hard shell with plaster rock molds; 60 percent complete |
| Backdrop: |
Free hand painted sheet rock |
| Completion: |
|
Here are a few pictures showing some of the scenes
(not finished) on the layout.


|